Novi Transportation Improvement Plan
The Transportation Improvement Plan for the I-96/I-696/I-275 corridors in Novi and Wixom was developed from the desire to improve traffic conditions along the surface streets in the area of the I-96/I-275 interchange and to plan for growth in the region.
Client
Michigan Department of Transportation
Oakland County TSC
Lori Swanson, PE
248-451-2456
Date: 2010-2012
Prime Consultant
The Corradino Group
Jim Hartman
248-799-0140
Our Task
The goal of the study was to develop a prioritized list of projects that improve safety and mobility in the study area and spur economic development for the entire region.
The Greenway Collaborative was responsible for the non-motorized transportation part of the study. Tasks included evaluating the existing bicycle and pedestrian conditions, identifying travel demands, developing and evaluating improvement scenarios and presenting preferred transportation alternatives.