Grand Rapids Bicycle Plan
Provides a framework to help illustrate what bicycle systems can be accomplished in the near future.
Client
The City of Grand Rapids
1120 Monroe Ave, NW 2nd Floor
Grand Rapids, MI 49503
Suzanne Schulz, Planning Director
Date: 2010-2012
Our Task
The Greenway Collaborative was hired by the City of Grand Rapids to assist with the City of Grand Rapids Bicycle Plan. TGC prepared a non-motorized analysis toolkit for the City to use in-house to assist in the development of the Bicycle Plan. Once the City drafted a plan, TGC evaluated the proposed facilities system and phasing approach and developed a Framework Plan to help layout a vision for the bicycle system. The vision illustrates what can be accomplished in the near-term via neighborhood connector routes, bike lanes and off-road trails.